JS and Melanie's Public and Special Events Album

Back
back

Previous
previous

20071201-111235-lx2-20451

  

Next
next

jsmoriss: The Toyo M-55s can be siped deeply if you're not pulling a heavy trailer, so I set the depth of the blades to a little less than 3/8" (12/32"). People that haul trailers may opt for 1/4" instead and sipe the tires again once the first sipes are nearly worn off.

It'll take a good 30-45 mins to sipe each tire. It also takes some effort to push the heated knife through the rubber. My plan is to take it easy and sipe one tire per day. :-) The heated knife kit should come with a dozen blades or so, and you may need to change the blade each time you use the knife. They bend back a bit (so you loose a bit of depth) and seem to become brittle after they cool down.

 

Change Width/Height: 

 


 Embedded EXIF Data [All]

Show Min 

Date Modified

Dec 01, 2007 at 11:19:09

Camera

Panasonic DMC-LX2

Software

Adobe Photoshop CS2 Windows

  

Keywords

2007, 200712, 20071201, hand siping toyo m-55s, jeep, lx2, projects

File ID

20071201-111235-lx2-20451.jpg

File Size

3372 KB

File Resolution

2376 x 3568 pixels (viewing at 426 x 640)

Uploaded

Dec 01, 2007 at 16:19:10

Previous
previous

Previous

Back to Folder
back to
folder

Next

Next
next

6 of 10

Copyright ©2003-2004 Jean-Sébastien Morisset and Mélanie Vallée. All rights reserved.